CA License #1045663 Licensed, Bonded & Insured
Monday - Friday: 8:00 am - 5:00 pm · 800.943.3605 · 510.473.5353
Rooter Solutions of CaliforniaEBMUD & sidewalk certificates since 2012
Oakland & East Bay · Since 2012

EBMUD Sewer Lateral Certificate in 72 Hours. No $4,500 Deposit.

Trenchless sewer lateral replacement and sidewalk certificates for Oakland, Berkeley and the East Bay, planned around your closing date so escrow never waits on a pipe.

  • Free estimate in 1 business day
  • Certificate within 72 hours
  • 4.6 on Yelp
CA License #1045663Verify on CSLB
Licensed, Bonded & InsuredCalifornia contractor
Serving the East Baysince 2012
4.6 on Yelp68 customer reviews
Why East Bay agents call us first

Your certificate, on time and without the hassle

Certificate in 72 hours

Once your lateral passes the EBMUD test, your certificate is in hand within three days.

No $4,500 EBMUD deposit

We finish before closing, so you skip the Time Extension Certificate and its deposit.

Free estimate in one business day

A clear, written quote fast, so you can plan your sale with real numbers.

Trenchless, minimal yard damage

We pull a new pipe through the old one from small access points, not a long trench.

Get a Free Estimate Reply within one business day
Do I need a certificate?

Who needs an EBMUD certificate, and when

If you own property in Oakland, Berkeley, Alameda, Emeryville, Piedmont, Albany, El Cerrito, Richmond or Kensington, the East Bay Municipal Utility District (EBMUD) requires a working sewer lateral. Proof is a compliance certificate, and three events trigger the requirement:

1

Selling or transferring the property

The most common reason. Escrow needs the certificate, or a costly deposit, to close.

2

A remodel or building permit over $100,000

Larger renovations must bring the sewer lateral up to standard.

3

Changing your water meter size

A bigger or smaller meter also triggers the inspection.

Short on time? Without a certificate at closing, EBMUD requires a Time Extension Certificate and a $4,500 deposit. We plan the work so you don't need either.
Sample EBMUD Compliance Certificate for Private Sewer Lateral, type: compliance, replaced lateral, valid for 20 years
What you receive: an EBMUD Compliance Certificate. A replaced lateral is good for 20 years.
How it works

Four simple steps from estimate to certificate

You always know what happens next, and when.

  1. 1

    Free estimate

    We inspect the lateral and send a clear, written quote.

    Within 1 business day
  2. 2

    Scheduling

    We book the work around your close of escrow date and handle the permits.

    Planned around your COE
  3. 3

    Trenchless work & testing

    We replace the line trenchless, then pass the EBMUD verification test with an inspector on site.

    Usually 1 to 2 days
  4. 4

    Certificate delivered

    Your EBMUD compliance certificate goes to you, your agent and escrow.

    Within 72 hours
Services

Everything you need to close on time

Trenchless sewer line replacement

A new, seamless pipe pulled through the old one. Less digging, less mess, and a faster finish.

How trenchless works →
Reviews

Trusted by East Bay homeowners, agents and investors

4.6

Average rating from 68 reviews on Yelp

Read our Yelp reviews
Get a Free Estimate References available from realtors and escrow officers we work with
For realtors, escrow officers & lenders

One call, and the certificate is handled before COE

  • Closing-date coordination with you and escrow
  • Certificate sent straight to the agent and escrow officer
  • Free estimates you can share with sellers the next business day
  • References from agents and escrow officers on request
Direct line for agents & escrow 800.943.3605 510.473.5353

Send us the property address and your close date. We'll take it from there and keep everyone posted.

Service area

Proudly serving the East Bay

  • Oakland
  • Berkeley
  • Alameda
  • Emeryville
  • Piedmont
  • Albany
  • El Cerrito
  • Richmond
  • Kensington
  • Castro Valley
Questions

Common questions

Who needs an EBMUD sewer lateral certificate?

Property owners in the EBMUD program area need one when they sell or transfer the property, pull a building or remodel permit over $100,000, or change their water meter size.

How fast can I get my certificate?

Your certificate is delivered within 72 hours of passing the EBMUD verification test. We schedule the work around your close of escrow so it arrives in time.

Do I have to pay the $4,500 EBMUD deposit?

No. That deposit is only for a Time Extension Certificate, when the work isn't done by closing. We finish before closing, so you don't need it.

Will you dig up my yard?

We use trenchless replacement. A new pipe is pulled through the old one from small access points, so there's no long trench across your yard.

How much does it cost?

It depends on the length and depth of your lateral, access, and your city's rules. Your free estimate is a clear, written quote, with no surprises.

How long is the certificate good for?

A certificate for a fully replaced sewer lateral is valid for 20 years. Keep it for any future sale, large remodel or water meter change.

Do you also handle sidewalk certificates?

Yes. Oakland requires a sidewalk certificate at title transfer. We inspect, repair if needed, and file it. Learn more about sidewalk certificates.

Free estimate

Get your free estimate

Tell us about the property. We reply within one business day with a clear, written quote, and we plan the work around your closing date.

  • Hours
    Monday - Friday8:00 am - 5:00 pm
    Saturday - SundayClosed
  • Office6114 La Salle Avenue, Ste 712, Oakland, CA 94611
Please enter your name.
Please enter a phone number.
Please enter a valid email, like name@example.com.
Please enter the property address.
Please choose a service.
We reply within one business day

We only use your details to prepare your estimate. No spam, ever.

Closing soon? Let's get your certificate on time.

Free estimate within one business day. No $4,500 EBMUD deposit.

Call (800) Call (510) Free Estimate